Action layer · 470 days to first declaration
First annual CBAM declaration is due 30/09/2027. Document your Iron and steel imports from Turkey now.
EU default-value mark-up is +10% in 2026 and rises to +20% in 2027 per Implementing Reg (EU) 2025/2621. Switching to supplier-verified emissions skips the mark-up entirely — but you need verified figures before the higher rate kicks in. Calculate your exposure today, share the results with your supplier, and lock in lower CBAM cost for the year ahead.
Sources: Reg (EU) 2023/956 Art 6(1) as amended by Reg (EU) 2025/2083 (CBAM Omnibus, 20 Oct 2025) — deadline postponed from 31 May to 30 September of the year following the import year. Implementing Reg (EU) 2025/2621 §3 (mark-up phase-in). PDF prices read live from tier_config; deadline reads from the central cbam_deadlines system-settings row at render time. Operator updates at /admin/system propagate within 1 h.
Importing Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas) from Turkey? Here's what CBAM costs you today.
100 tonnes of CN 73064020 from Turkey
By 2028 the same shipment costs €57,997 as the EU markup increases (Reg 2025/2621 §3 phases +10% → +20% → +30%). Your shipment may differ — yours may have lower verified emissions.
Calculated at the current CBAM certificate price of €75.36/tCO₂e × the EU default emission intensity for Turkey (Reg 2025/2621). Landed-cost ratio uses Eurostat Comext market price (DS-045409).
Key CBAM facts for CN 73064020 (Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas))
| Metric | Value |
|---|---|
| CBAM scope status | In scope per Regulation (EU) 2023/956 Annex I |
| Top EU supplier (latest period) | Turkey |
| EU default emission intensity (top origin) | 5.92 tCO₂e per tonne of goods |
| Current CBAM certificate price | €75.36 per tCO₂e |
| CBAM cost for a 100-tonne shipment (2026) | €49,074 |
| Trade data as of | 01/2026 |
Sources: Eurostat Comext (top supplier, trade volume, market price); EU Commission DG TAXUD “DVs as adopted” Excel (default intensity, Reg 2025/2621); EU TAXUD CBAM certificate-price publication (Reg 2025/2548). All figures live from DB; no fabrication.
Problem
CN 73064020 (Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas)) is in CBAM scope as iron and steel. EU defaults for Turkey: 5.92 tCO₂e/t direct. Reg 2023/956 Annex I.
Implication
At €75.36/tCO₂e, 100 t = €49,074 ≈ 72.2% of landed cost. By 2028, ≈ €57,997 as defaults markup phases to +30%.
Solution
Free calculator with CN 73064020 pre-filled (5 min). On-screen result instantly. Tamper-evident PDF for customs from €49. Open calculator →
CN 73064020 (Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas)) is in CBAM scope. The largest current EU supplier is Turkey, at an EU default emission intensity of 5.92 tCO2e per tonne — which becomes 6.51 tCO2e in 2026 with the +10% statutory markup applied. For a typical 100-tonne shipment from Turkey, that translates to €49,074 in CBAM cost in 2026 and €57,997 in 2028 — an increase of €8,923 per shipment as Reg 2025/2621 §3 phases the markup from +10% to +30%. Among CBAM-eligible origins with published EU defaults, the lowest CBAM cost for CN 73064020 is from Taiwan — saving approximately €27,994 per 100 t versus the current top supplier Turkey at 2026 markup.
Where every euro goes — CBAM as % of landed cost
For a 100-tonne shipment of CN 73064020 from Turkey, CBAM is 41.9% of every euro you spend importing. By 2028 it grows to 46.1% as the EU markup phases to +30%.
By 2028 (peak markup phase, +30%)
“Landed cost” here = goods value (Eurostat Comext €/kg × 100 t) + CBAM cost (EU 2026 marked-up default × current cert price). Excludes freight, transmission losses, market premiums — those vary per importer. Source data from cbam_comext_partner_facts × cbam_country_defaults × cbam_certificate_prices.
The same shipment costs more every year you delay
EU markup phases +10% (2026) → +20% (2027) → +30% (2028+). Locking in a 2026 calc today saves €8,923 per 100 t shipment by 2028.
Show year-by-year cost breakdown
+€8,923 per 100 t shipment by 2028 — unless you switch to supplier-verified emissions before then. Per Reg 2025/2547 §3, verified intensity bypasses the markup.
Calculate now — share with supplier — lock in 2026 ratesComputed from EU default for Turkey × current CBAM cert price. Reg 2025/2621 §3.
Top EU suppliers of CN 73064020 — and what each costs
Taiwan saves €27,994 per 100 t vs Turkey at current EU defaults — Taiwan's default is 57.0% lower.
Show top 10 origins comparison
| Origin | Share % | Default tCO₂e/t | Cost / 100 t (2026) |
|---|---|---|---|
| Turkeytop supplier | 69.1% | 5.92 | €49,074 |
| India | 10.1% | 6.50 | €53,882 |
| China | 7.0% | 7.03 | €58,234 |
| North Macedonia | 4.5% | 2.91 | €24,123 |
| Ukraine | 3.8% | 3.73 | €30,945 |
| United Arab Emirates | 2.8% | — | — |
| Taiwancheapest CBAM | 0.9% | 2.54 | €21,080 |
| Oman | 0.5% | — | — |
| Vietnam | 0.5% | 3.12 | €25,864 |
| Korea (South) | 0.2% | 4.11 | €34,103 |
Cheapest CBAM cost on this CN: import from Taiwan — saves €27,994 per 100 t vs the current top supplier (Turkey).
Sources: Eurostat Comext (DS-045409) for trade mass + market share; EU Reg 2025/2621 for default emission intensities; latest CBAM cert price for the EUR conversion. All figures live from DB; no fabrication. Granularity caveat: Eurostat publishes partner-trade flows at HS-4 level only — the share % above describes the entire HS heading 7306 family, not one specific 8-digit subcode. Default intensities and cost per 100 t are CN-specific where the EU publishes per-CN values.
3 questions every CBAM declaration faces
Every PDF you generate for CN 73064020answers all three with cited regulation refs. That's the difference between a calculator output and an audit-ready document.
Show the three cards
Where did the data come from?
Live from Eurostat Comext (DS-045409), refreshed weekly via thecbam-comextcron. Refresh timestamps tracked in cbam_source_runs.
Can it be verified?
Every PDF carries a SHA-256 hash + QR code linking to a public verify page (verification methodology). Auditors trace any figure back to its EU regulation citation in the PDF footer.
What if EU updates the defaults?
Our cron tracks cbam_country_defaults weekly. PDFs you bought stay valid (snapshot of values at purchase time); the calculator uses the latest. PRO subscribers get an audit-log JSON recording every figure's timestamp.
Default Penalty Tax — what verified emissions could save you
Save up to €48,253 per 100 t with supplier-verified emissions at the EU benchmark intensity (Reg 2025/2620 §5.3). You're throwing €48,253to Brussels because you don't have data.
Show the 2-bar comparison
The benchmark is the EU's best-practice reference, not a guarantee. Your supplier's actual verified intensity may be higher or lower than the benchmark — but in most cases it's materially lower than the marked-up default. Default leg uses Turkey's 2026 marked-up value.
What part of the CBAM bill is actually avoidable?
Of the €49,074 CBAM cost on a 100-tonne shipment of CN 73064020 from Turkey, €48,253 (98%) is avoidable with verified supplier data. The rest is the EU benchmark floor — physics, not penalty.
Benchmark floor
€821
Unavoidable. What you pay even if your supplier matches EU best-practice intensity (Reg 2025/2620 §5.3 benchmark = 0.11 tCO₂e/t).
Data-availability gap
€43,792
Avoidable if your supplier's actual intensity is below the EU default (5.92 tCO₂e/t). Verified data beating default closes this gap.
Markup penalty
€4,461
Avoidable by getting any verified data — Reg 2025/2621 §3's +10/+20/+30% statutory uplift only applies to defaults, not verified emissions.
The action: get one document from your supplier — a verifier-stamped emission statement per Reg 2025/2547 §3. That single document collapses the amber + red segments into the green floor.
Sources: cbam_benchmarks for the EU best-practice intensity (Reg 2025/2620 §5.3); cbam_country_defaultsfor per-origin default intensity + 2026 marked-up value (Reg 2025/2621 §3); current cert price. “Avoidable” means via verified supplier data, not via origin-switching or any commercial route.
Audit-trail readiness — every PDF for CN 73064020 ships compliance-grade
Every PDF for CN 73064020 ships audit-ready: SHA-256 hash + QR + reg citations baked in. Designed for the question that comes after customs clearance — the audit two years later.
Show the 3-point audit checklist
Source citations baked in
Reg 2023/956 Annex I (scope), Reg 2025/2621 §3 (default-value markup), Reg 2025/2620 §5.3 (free-allocation benchmark) — each PDF page footer cites the exact article + access date. For CN 73064020, your PDF will cite the 04/02/2026 effective-from date of the Turkey default-value row used.
Tamper-evident hash
SHA-256 of the report bytes + QR code linking to /verify/{report_id}. An auditor confirms the document hasn't been altered since generation, and re-fetches the original timestamps from the public verification page.
Provenance log
Every value used (default intensity, cert price, scope status) carries the source-runner refresh timestamp from
cbam_source_runs. CBAM PRO subscribers get a downloadableaudit-log.jsonper declaration bundle — every input traceable to its EU source URL + fetch date.
Where on the map does CN 73064020 hurt your CBAM bill the most?
Origins coloured by EU default intensity. Greener origins cut both CBAM cost and audit complexity — less to verify, fewer surprises in your data.
Show the 15-origin grid
Taiwan
2.54 tCO₂e/t
€21,080 per 100 t
Azerbaijan
2.57 tCO₂e/t
€21,304 per 100 t
Serbia
2.59 tCO₂e/t
€21,470 per 100 t
North Macedonia
2.91 tCO₂e/t
€24,123 per 100 t
Philippines
2.92 tCO₂e/t
€24,206 per 100 t
Chile
2.95 tCO₂e/t
€24,454 per 100 t
Bosnia and Herzegovina
3.11 tCO₂e/t
€25,781 per 100 t
Uzbekistan
3.12 tCO₂e/t
€25,864 per 100 t
Vietnam
3.12 tCO₂e/t
€25,864 per 100 t
Myanmar
3.13 tCO₂e/t
€25,946 per 100 t
Iran
3.20 tCO₂e/t
€26,527 per 100 t
United States
3.27 tCO₂e/t
€27,107 per 100 t
Canada
3.29 tCO₂e/t
€27,273 per 100 t
Mexico
3.30 tCO₂e/t
€27,356 per 100 t
Algeria
3.30 tCO₂e/t
€27,356 per 100 t
Origins in green have ~23% lower EU default intensity than red-zone origins. Importing from a green-zone supplier can cut your CBAM cost AND reduce audit complexity (fewer EU-accredited verifiers operate in red-zone countries — industry rule of thumb, not regulatory).
Source: cbam_country_defaults for CN 73064020, sorted ASC by total emission intensity (Reg 2025/2621 §3). Quartiles binned across the 15-origin set returned. CBAM-eligible non-EU non-Annex-III only.
Your CBAM calendar — when each penalty hits your P&L
next cert price ~07/07/2026 · 198 days to next markup phase.
Show all 5 milestones
- 07/07/2026estimate20 days
Next CBAM cert-price publication (estimate, after 2026-Q1)
cbam_certificate_prices cadence
- 01/01/2027198 days
EU default-value markup phases +10% → +20%
Reg 2025/2621 §3
Lock in 2026 verified emissions before this date - 30/09/2027470 days
First annual CBAM declaration deadline (for 2026 imports)
Reg 2023/956 Art 6(1) as amended by Reg 2025/2083
Start documenting your shipments now - 30/09/2027470 days
Annual CBAM-certificate surrender deadline
Reg 2023/956 Art 22 (concurrent with declaration)
- 01/01/2028563 days
EU default-value markup phases +20% → +30% (final phase-in)
Reg 2025/2621 §3
Definitive-period dates only — quarterly reports ended 31 December 2025 (transitional period closed). Sources: Reg 2023/956 Art 6(1) + Art 22; Reg 2025/2621 §3; per-CN expiry from cbam_country_defaults and cbam_cn_scope.
Hidden opportunity — procurement angle
💡 Switching from Turkey to Taiwan pays off if their goods premium stays under 48.7%. Competitors paying defaults are 48.7% more expensive at the customer — that's a marketing weapon, not just compliance.
Show year-by-year tolerance bars
Top current supplier of CN 73064020: Turkey (EU default 5.92 tCO₂e/t). Lowest-default-intensity CBAM-eligible alternative: Taiwan (EU default 2.54 tCO₂e/t).
Tolerance grows yearly — every markup phase makes the lower-default origin more competitive on landed cost.
Compare both origins side-by-side in the calculatorThreshold, not claim: we compute the maximum goods-price premium for Taiwanwhere switching still saves money. We don't have visibility into your supplier negotiations; the actual quoted premium varies by supplier and contract.
EU defaults are conservative: your existing supplier's verified emissions may already be at or below Taiwan's default. Run with verified data when available.
Sources: Eurostat Comext (DS-045409) for Turkey market price-per-kg;cbam_country_defaults for both origins' intensities; current cert price.
Are you sure CN 73064020 is the right code? (We checked the boundaries)
23 8-digit CN codes in HS heading 7306 are tracked as in CBAM scope per Annex I (Reg 2023/956). You're not missing a loophole — make sure your shipments are classified correctly across this heading.
Show all 23 in-scope codes in heading 7306
| CN code | Description | Effective from |
|---|---|---|
| 73060000 | Tubes, pipes and hollow profiles "e.g., open seam or welded, riveted or similarly closed", of iron or steel (excl. of cast iron, seamless tubes and pipes and tubes having internal and external circular cross-sections and an external diameter of > 406,4 mm) | 04/02/2026 |
| 73061100 | Line pipe of a kind used for oil or gas pipelines, welded, of flat-rolled products of stainless steel, of an external diameter of <= 406,4 mm | 04/02/2026 |
| 73061900 | Line pipe of a kind used for oil or gas pipelines, welded, of flat-rolled products of iron or steel, of an external diameter of <= 406,4 mm (excl. products of stainless steel or of cast iron) | 04/02/2026 |
| 73062100 | Casing and tubing of a kind used in drilling for oil or gas, welded, of flat-rolled products of stainless steel, of an external diameter of <= 406,4 mm | 04/02/2026 |
| 73062900 | Casing and tubing of a kind used in drilling for oil or gas, welded, of flat-rolled products of iron or steel, of an external diameter of <= 406,4 mm (excl. products of stainless steel or of cast iron) | 04/02/2026 |
| 73063012 | Precision tubes, welded, of circular cross-section, of iron or non-alloy steel, cold-drawn or cold-rolled "cold-reduced" | 04/02/2026 |
| 73063018 | Precision tubes, welded, of circular cross-section, of iron or non-alloy steel (excl. cold-drawn or cold-rolled) | 04/02/2026 |
| 73063041 | Threaded or threadable tubes "gas pipe", welded, of circular cross-section, of iron or non-alloy steel, plated or coated with zinc | 04/02/2026 |
| 73063049 | Threaded or threadable tubes "gas pipe", welded, of circular cross-section, of iron or non-alloy steel (excl. products plated or coated with zinc) | 04/02/2026 |
| 73063072 | Other tubes, pipes and hollow profiles, welded, of circular cross-section, of iron or non-alloy steel, of an external diameter of <= 168,3 mm, plated or coated with zinc (excl. line pipe of a kind used for oil or gas pipelines or casing and tubingof a kind used in drilling for oil or gas) | 04/02/2026 |
| 73063077 | Other tubes, pipes and hollow profiles, welded, of circular cross-section, of iron or non-alloy steel of an external diameter of <= 168,3 mm (excl. plated or coated with zinc and line pipe of a kind used for oil or gas pipelines, casing and tubing of a kind used in drilling for oil or gas, precision tubes and threaded or threadable tubes "gas pipe") | 04/02/2026 |
| 73063080 | Tubes, pipes and hollow profiles, welded, having a circular cross-section, of iron or steel, of an external diameter of > 168,3 mm but <= 406,4 mm (excl. line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas, or precision steel tubes, electrical conduit tubes or threaded or threadable tubes "gas pipe") | 04/02/2026 |
| 73064020 (current) | Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas) | 04/02/2026 |
| 73064080 | Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel (excl. products cold-drawn or cold-rolled "cold-reduced", tubes and pipes having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas) | 04/02/2026 |
| 73065021 | Precision steel tubes, welded, of circular cross-section, of alloy steel other than stainless, cold-drawn or cold-rolled "cold-reduced" | 04/02/2026 |
| 73065029 | Precision steel tubes, welded, of circular cross-section, of alloy steel other than stainless (excl. cold-drawn or cold-rolled) | 04/02/2026 |
| 73065080 | Tubes, pipes and hollow profiles, welded, of circular cross-section, of alloy steel other than stainless (excl. tubes and pipes having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas, and precision steel tubes) | 04/02/2026 |
| 73066110 | Tubes and pipes and hollow profiles, welded, of square or rectangular cross-section, of stainless steel | 04/02/2026 |
| 73066192 | Tubes and pipes and hollow profiles, welded, of square or rectangular cross-section, of iron or steel other than stainless steel, with a wall thickness of <= 2 mm | 04/02/2026 |
| 73066199 | Tubes and pipes and hollow profiles, welded, of square or rectangular cross-section, of iron or steel other than stainless steel, with a wall thickness of > 2 mm | 04/02/2026 |
| 73066910 | Tubes, pipes and hollow profiles, welded, of non-circular cross-section, of stainless steel (excl. tubes and pipes having internal and external circular cross-sections and an external diameter of > 406,4 mm, line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas, and tubes and pipes and hollow profiles of square or rectangular cross-section) | 04/02/2026 |
| 73066990 | Tubes, pipes and hollow profiles, welded, of non-circular cross-section, of iron or steel other than stainless steel (excl. tubes and pipes having internal and external circular cross-sections and an external diameter of > 406,4 mm, line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas, and tubes and pipes and hollow profiles of square or rectangular cross-section) | 04/02/2026 |
| 73069000 | Tubes, pipes and hollow profiles "e.g., open seam, riveted or similarly closed", of iron or steel (excl. of cast iron, seamless or welded tubes and pipes and tubes and pipes having internal and external circular cross-sections and an external diameter of > 406,4 mm) | 04/02/2026 |
We list codes in cbam_cn_scope for HS heading 7306— the codes the EU's “DVs as adopted” Excel lists in scope. Codes outside our table for this heading may be exempt OR may have been added recently. Scope can change if EU revises Annex I. We monitor weekly via the cn-scope cron.
Don't know how to ask your supplier for emission data?
📨 We'll write the letter for you — legal-grade, in Turkish, citing Reg 2025/2547 §3 verbatim. Free, email-delivered. No competitor offers this; consultancies charge €5,000+ for equivalent letters.
See what the letter requests + how it works
What the letter asks for (exactly the 6 inputs Reg 2025/2547 §3 entitles you to request from the producer):
- Direct emission intensity (tCO₂e per tonne of CN 73064020)
- Indirect emission intensity (tCO₂e per tonne)
- Production route (e.g. blast furnace / electric arc furnace for steel)
- Aggregated parameter for input materials (precursors)
- Verifier statement per §6 (EA-recognised verifier)
- Statement of carbon price already paid in country of origin (Reg 2023/956 Art 9 deduction support)
How it works: fill in your supplier's name + email + your company details + annual import volume. We generate a tamper-proof PDF + email-ready text and email it to YOU (not your supplier directly) — you stay in control of the relationship.
Generate the letter for CN 73064020 — Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas)Letter content cites EU regulations verbatim; no fabrication. Turkishtranslation available alongside the English version. Disclaimer in the letter: “Translation in good faith; English version prevails.”
Origin carbon-price deduction (Article 9)
Article 9 of Regulation (EU) 2023/956 lets importers deduct any verified carbon price already paid in the country of origin from the CBAM certificate cost. If your Turkeysupplier participates in a domestic ETS or carbon-tax scheme and can produce verifier-attested proof of payment, you enter the €/tCO₂e in the calculator's Origin carbon price paid field and the deduction is applied to the gross cost.
We do not publish a live table of Turkey's domestic carbon prices on this page — the value depends on the specific scheme + verification, not a public daily print. Speak with your supplier and provide the verified figure to the calculator yourself.
Resources
Frequently asked: CBAM imports from CN 73064020 (Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas))
Is CN 73064020 (Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas)) in CBAM scope?
Yes. CN 73064020 is classified under the iron and steel sector in CBAM scope per Annex I of Regulation (EU) 2023/956. EU importers of this CN code must comply with CBAM reporting obligations from January 2026 (definitive period). Verify scope status with our cn-scope monitor cron, refreshed weekly.
What is the EU default emission intensity for CN 73064020?
The European Commission publishes country-specific default emission values for CN 73064020 under Implementing Regulation (EU) 2025/2621. Across CBAM-eligible non-EU origins, the published range is 2.54 tCO2e per tonne (Taiwan — lowest published default) to 8.69 tCO2e per tonne (Indonesia — highest published default). The 2026 marked-up value adds +10% per Reg 2025/2621 §3, phasing to +20% in 2027 and +30% from 2028.
Where can I import CN 73064020 most cheaply (CBAM cost)?
By 2026 marked-up EU default emission intensity × current CBAM certificate price (€75.36/tCO2e), the lowest CBAM cost per 100-tonne shipment comes from: Taiwan (€21,080 per 100 t), North Macedonia (€24,123 per 100 t), Vietnam (€25,864 per 100 t). This ranks origins by EU-published default intensity only — your supplier's verified emissions may put any origin lower. Run the calculator at /cbam/calculator with your specific shipment for an exact comparison.
Can my supplier's verified emissions reduce my CBAM cost on CN 73064020?
Yes. Per Implementing Regulation (EU) 2025/2547 §3, an importer can substitute the EU default emission intensity with a supplier-verified figure. The verified figure must come from an EA-recognised verifier per Reg (EU) 2025/2546 (verification of declared embedded emissions). For most imports the verified intensity is materially lower than the default + statutory markup, so getting verified data from your supplier reduces CBAM cost. Article 9 of Regulation (EU) 2023/956 also lets you deduct the carbon price already paid in the country of origin from the CBAM surrender obligation, with verified documentation.
Have a question about CBAM imports from CN 73064020 (Tubes, pipes and hollow profiles, welded, of circular cross-section, of stainless steel, cold-drawn or cold-rolled "cold-reduced" (excl. products having internal and external circular cross-sections and an external diameter of > 406,4 mm, and line pipe of a kind used for oil or gas pipelines or casing and tubing of a kind used in drilling for oil or gas))that isn't covered? Email [email protected] — we'll publish answers to common ones here.